Key project inputs are span, height, wind and snow actions, openings and equipment interfaces. BRD coordinates the steel frame and insulated envelope as one scope.

Foundation, column grid, roof drainage, fire requirements and crane loads should be resolved early.

BRD project support
Technical selection, product configuration, delivery interfaces and current documentation are confirmed around the actual project brief.




